Industries / Manufacturing
Manufacturing
The shop floor asks.
Your documents answer.
Maintenance manuals, SOPs, inspection reports and work instructions — queryable in plain language by every engineer, with the source cited.

A day with BodhAI
Follow a maintenance lead through one shift.
07:40 · Pre-shift
Maintenance lead
Torque spec and lockout steps for the HX-320 spindle swap?
BODHAI
45 Nm in three passes (15 / 30 / 45). LOTO: isolate main + pneumatic, verify zero energy at the panel. Note — last MOC raised torque from 40 Nm.📄 Maintenance_Manual §6.4📄 MOC-2025-11
11:15 · Line stop
QA engineer
Chatter marks on batch 4417 — have we seen this failure before?
BODHAI
Twice: NCR-118 (worn carbide insert) and NCR-097 (spindle bearing play). Both closed by tool change + recalibration — 8D report attached.📄 NCR_Log_2025📄 8D_Report_097
16:30 · Handover
Shift supervisor
Build the night-shift handover: open NCRs, PMs due, safety notes.
BODHAI
Done — one page, three open items, tomorrow's PM window flagged.PDF
Handover_Shift_B.pdf
generated · three open items
Where BodhAI sits
Inside the production line. Not another silo.
Machine docs
manuals · drawings
SOPs & NCRs
living records
BodhAI
on your server
Cited answers
on the floor
ERPNext
in development
50+
manuals, one index
119
languages incl. hindi
100%
on-premise
5 min
install